Structuring Engineering Workflows to Eliminate 90% of Drawing Production Time
Fielconforto, an HVAC contractor specializing in restaurant construction, reduced schematic production time by approximately 90% through the adoption of a structured vector-based engineering workflow. This case study examines the transition from manual drafting to object-based component systems, the resulting operational improvements, and the broader implications for engineering firms facing similar scalability challenges.
Lara Sousa, Álvaro Moreira, Jorge Soares